Always 'ResourceRequirement'
Maximum reserved number of CPU cores
Minimum reserved number of CPU cores
Maximum reserved filesystem based storage for the designated output directory, in mebibytes (2**20)
Minimum reserved filesystem based storage for the designated output directory, in mebibytes (2**20)
Maximum reserved RAM in mebibytes (2**20)
Minimum reserved RAM in mebibytes (2**20)
Maximum reserved filesystem based storage for the designated temporary directory, in mebibytes (2**20)
Minimum reserved filesystem based storage for the designated temporary directory, in mebibytes (2**20)
Specify basic hardware resource requirements.
"min" is the minimum amount of a resource that must be reserved to schedule a job. If "min" cannot be satisfied, the job should not be run.
"max" is the maximum amount of a resource that the job shall be permitted to use. If a node has sufficient resources, multiple jobs may be scheduled on a single node provided each job's "max" resource requirements are met. If a job attempts to exceed its "max" resource allocation, an implementation may deny additional resources, which may result in job failure.
If "min" is specified but "max" is not, then "max" == "min" If "max" is specified by "min" is not, then "min" == "max".
It is an error if max < min.
It is an error if the value of any of these fields is negative.
If neither "min" nor "max" is specified for a resource, an implementation may provide a default.